Opened 8 years ago
Closed 8 years ago
#279 closed task (fixed)
Extention of the Project entry
Reported by: | Rene Ranzinger | Owned by: | shan |
---|---|---|---|
Priority: | normal | Milestone: | GRITS - 1.1 |
Component: | GRITS core | Version: | GRITS 0.9.x |
Severity: | major | Keywords: | |
Cc: | shan |
Description
Collaborative project with the CCRC Service Lab and Tiemeyer Lab.
Review existing information
- Remove Creator
- Extend the description field in size
All information besides the Dates will be stored in a separate file
Add a table for collaboration partners. For each partner the following information is stored (column of the table):
- Name*
- Group/PI name*
- Department
- Institution
- Address*
- Country* (dropdown)
- Phone
- Fax
- Position (dropdown PI, PostDoc etc. but with option to define new one)
- Funding Agency* (dropdown PI, PostDoc etc. but with option to define new one)
- Grant number
Create a separate table of analysts
- Name (dropdown with possibility to create new one)
- Role
- Task
For each Project add a list of user defined keywords (tags)
For each Project add table with key dates
- Name of the data (e.g. date of preliminary report, date of project end)
- Date
Preference
- List of Tags
- Name of Dates
- Name of Analysts
- Positions
- Funding Agency
Change History (4)
comment:1 Changed 8 years ago by
Owner: | set to shan |
---|---|
Status: | new → assigned |
comment:2 Changed 8 years ago by
Status: | assigned → accepted |
---|
comment:3 Changed 8 years ago by
Resolution: | → fixed |
---|---|
Status: | accepted → review |
- changed in Revision 103 in the SVN branch
comment:4 Changed 8 years ago by
Status: | review → closed |
---|
Note: See
TracTickets for help on using
tickets.